Logo Hervé Jamet - www.jamet.org SAINT-MALO PORT LOCK

Replacement of the downstream gates in August 2003

Home

Saint-Malo

The Lock

1948-1950

August 2003

The works

Rebuilt in 1950, the downstream gates of Saint-Malo port lock were highly corroded, and their watertightness was defective. Moreover, they were almost not repairable.

Therefore, they had to be replaced. One month was necessary to do it; August 2003 was choosen, because the port activity was less significant during this month. Of course, no ship could go in or out the port during the works.

The works were broken down into several steps :


  Copyright Hervé Jamet Version française